Home> Products> Low-Pressure Casting Parts> Low-Pressure Motor Parts> ZL101A Low-Pressure Casting Motor Parts
ZL101A Low-Pressure Casting Motor Parts
ZL101A Low-Pressure Casting Motor Parts
ZL101A Low-Pressure Casting Motor Parts

ZL101A Low-Pressure Casting Motor Parts

Payment Type:L/C,T/T,Paypal
Incoterm:FOB,CIF
Min. Order:5000 Piece/Pieces
Transportation:Ocean,Air
Port:Ningbo,Shanghai
option:
  • Packaging:carton
  • Diameter:302.9
  • thickness:4.22
  • weight:299.8g
  • Normal Precision Tolerance:±0.025
  • Special Precision Tolerance:±0.01

  • Product Attributes
  • Packaging & Delivery
  • Product Description
  • Supply Ability & Additional Information
Product Attributes

Model No.L110237

BrandBLG

IncotermFOB,CFR,CIF,FCA

DeckDouble

Raw MaterialAluminum Alloy

Surface FinishShot Blasting

StatusCustom Made

Cavity Number1

NC MachineBrother,Japan

TypePower System

Sizeφ302.9*192.7

Casting Machine1M*1M

Packaging & Delivery
Selling Units: Piece/Pieces
Package Type: carton, PE pallet, PE flow box, steel box, wooden pallet, container
Picture Example:
Product Description

This part is using in motor, the raw material of this Low-Pressure Motor Parts is ZL101A.The main processes of this Low-Pressure Casting Parts are:Low-pressure casting: Metal die filled with molten aluminum at low pressure (1-2 bar). Produces complex and smooth components.

T6 Treatment: Heat treatment of aluminum parts for improved strength and hardness. Solutionizing and aging steps involved.

Shot Blasting: Propelling abrasive particles at high speed to clean and smoothen component surfaces.

CNC Turning: Machining process using computer-controlled lathe to shape cylindrical parts.

Cleaning: Once the machining is complete, the castings go through a cleaning process to remove any remaining contaminants, such as oils, cutting fluids, or debris. This is typically done through a combination of chemical cleaning, ultrasonic cleaning, and/or high-pressure water or air rinsing.

Packaging: After cleaning, the castings are inspected for quality and prepared for packaging. They may be sorted, labeled, and packaged according to customer specifications or industry standards. Packaging materials, such as boxes, crates, or pallets, are used to protect the castings during transportation.

Usually the lead time is about 35 days.

Any inquiries will be welcome for our great support.

179.ZL101A Low-Pressure Casting Motor Parts 2023-03-31


Leak Testing

Supply Ability & Additional Information

Packaging carton, PE pallet, PE flow box, steel box, wooden pallet, container

Productivity50000/year

TransportationOcean,Air

Place of OriginChina

Supply Ability50000/year

CertificateIATF16949,ISO14001,ISO45001

HS Code7616991090

PortNingbo,Shanghai

Payment TypeL/C,T/T,Paypal

IncotermFOB,CIF

Home> Products> Low-Pressure Casting Parts> Low-Pressure Motor Parts> ZL101A Low-Pressure Casting Motor Parts

CONTACT US

To: NINGBO ZHENHAI BOLANG METAL PRODUCTS FACTORY

Copyright © 2024 NINGBO ZHENHAI BOLANG METAL PRODUCTS FACTORY All rights reserved. Privacy Policy

Send Inquiry
*
*

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send